PHASE 11 · CLOUD DEPLOYMENT PREPARATION

Private Cloud Staging

A controlled hosting plan for verified staff access, with isolated test infrastructure and no activated participant-record API.

Phase 12 verified locally: 160 synthetic tests passed, including Cloud Run IAM security checks. No cloud instance is deployed. Read Phase 12 verification plan.
Cloud hosting has not been provisioned. The Node.js staging reference is ready for an authorized Google Cloud Run operator. The existing Wix website continues to serve its current pages. This page is a public, informational status update and does not provide access to client records, account credentials, or case-management tools.
129 / 129Local automated checks passed
503Protected endpoint is disabled
2 offWix restricted features remain disabled
PREPARED LOCALLY

Private staging container

Node.js 22 and a restricted container entrypoint are configured for an IAM-protected Cloud Run reference deployment. Its process cannot instantiate the administrator-only Wix adapter.

Container creation and cloud launch are pending an approved cloud account.

TESTED

Release safeguards

Startup refuses attempts to enable protected records, inject private Wix credentials, change deployment tiers, or substitute unapproved origins. Local request tests returned HTTP 200 for health, 503 for restricted data, and 403 for incorrect Origin.

REQUIRES CLOUD OWNER

Hosting and billing

A project owner must select a cloud project and approved region, configure IAM, verify billing and cost limits, and authorize a private service deployment. No public API invocation should be enabled during this test stage.

The reference deployment script requires explicit authorization and refuses to run by default.

NOT ENABLED

Wix member integration

Production member verification, instructor approval, active assignments, client consent, cross-division controls, audit retention and research governance are future acceptance gates—not claims of completed live integration.

Neither partner caseloads nor Person 360 records can be released by the Phase 11 staging package.

Before any client-record pilot

  • Establish an approved private cloud runtime and demonstrate IAM-only access with fictional traffic.
  • Confirm provider-specific member-token audience and site-scoping safeguards.
  • Approve and test instructor role policy, individual grants, participant authorization, minimal data projection, and secure audit.
  • Pass a documented privacy/security review, including revocation, escalation and emergency shutdown.
  • Authorize a separate production backend release; never turn the current staging sentinel into a record-access service.

Review Phase 10 baseline · Review staff gateway design · Staff Portal

Development status verified on November 16, 2026. Test results refer to local fictional cases and do not certify live security compliance. Cloud setup and production activation remain uncompleted.